Mission Control

Simulated operational telemetry for the VTX-1 orbital vehicle.

Downlink
98%
Throughput
4.2 GB/s
Latency
12 ms

Data Source

Live Telemetry

Orbital Velocity

24500

km/h
Mission Elapsed Time
T+ 00:04:21

Orbital Altitude

408.00

km

Systems Check

ALL SYSTEMS GO
GNC ComputerNOMINAL
RDE PropulsionACTIVE
RCS ThrustersSTANDBY
Thermal LoopsNOMINAL
Payload LockSECURED

Consumables & Environment

Liquid Oxygen (LOX)98.0%
Liquid Methane (CH₄)98.0%

Cabin Pressure

14.70 psi

External Temp

-120.4 °C

Battery Bank

96.4 %

Radiation

0.4 mSv

/// VTX_FLIGHT_LOG_01
[14:04:22]Telemetry packet #4920 verified. CRC check passed.
[14:04:20]Downlink bandwidth nominal. Signal integrity 98%.
[14:03:55]EVENT: Stage 1 separation confirmed.
[14:03:45]MECO (Main Engine Cutoff) confirmed.
[14:03:10]Max-Q dynamic pressure passed.
[14:00:00]LIFTOFF. Clock started.

--- SYSTEM LOG ARCHIVE INITIALIZED ---